What to Expect During Commercial Door Installation & Replacement

Installing or replacing commercial doors is a vital step for businesses looking to enhance security, energy efficiency, accessibility, or aesthetics. Whether it’s an aluminum storefront, steel security door, or fire-rated exit, professional installation ensures your doors meet code, function properly, and look polished.

If you’re planning a door upgrade, knowing what to expect during the process helps you prepare and minimize disruptions to your operations. Here’s a detailed breakdown of the steps involved in commercial door installation and replacement.

1. Initial Consultation and Site Assessment

The process typically begins with a professional consultation and on-site inspection. During this stage, the contractor evaluates your existing doors, takes measurements, and assesses building structure, traffic flow, and usage requirements.

What’s involved:

  • Discussing your needs (security, design, compliance, etc.)
  • Choosing the right type of door (metal, glass, wood, rolling, fire-rated)
  • Measuring openings and surrounding framing
  • Checking for damage or required repairs in walls, frames, or thresholds

This step ensures that the right materials and hardware are selected for your unique business environment.

2. Product Selection and Customization

After the assessment, you’ll choose your preferred door style, material, finish, and features. Commercial doors are highly customizable to match both function and branding.

You’ll select:

  • Door type (manual or automatic, single or double)
  • Materials (steel, aluminum, fiberglass, glass, wood, etc.)
  • Hardware (handles, locks, closers, hinges, push bars)
  • Fire-rating, ADA compliance, and security features
  • Color, finish, and branding options

Lead times for custom or specialty doors may vary, so this stage may take a few days to a few weeks, depending on order complexity.

3. Scheduling and Preparing for Installation

Once your doors are manufactured or selected, your contractor will coordinate installation around your business hours to reduce downtime or customer disruption.

Preparation tips:

  • Notify staff and customers about the scheduled work
  • Clear access to the installation area
  • Secure valuable inventory or equipment near the door zone
  • Plan for restricted access during installation hours

Some businesses schedule door installation after-hours or during off-peak times for convenience.

4. Removal of Existing Doors

If you’re replacing an existing door, the crew will safely remove the old unit. Depending on age and condition, this may involve dismantling the frame, thresholds, or damaged materials around the door.

During removal:

  • Technicians will use protective equipment to prevent structural damage
  • Debris is cleared from the site
  • Old frames or hardware may be reused if compatible and in good condition

Proper removal ensures a clean surface for secure and accurate new door placement.

5. Frame Installation and Structural Adjustments

Next comes preparing the opening for the new door. If the existing frame is damaged or not level, the crew may need to make adjustments, reinforce the wall, or install a new frame entirely.

Common tasks include:

  • Ensuring the opening is plumb, level, and square
  • Installing or anchoring a new frame to the structure
  • Sealing gaps for insulation and water resistance
  • Prepping the floor for thresholds or auto door sensors

This step is critical for proper alignment and long-term durability.

6. Installing the New Door and Hardware

Once the frame is set, the actual door is mounted and secured. This includes precise fitting, balancing, and attaching any required hardware.

Components installed:

  • Hinges, handles, push bars, and locks
  • Closers and panic devices (for emergency exits)
  • Automatic sensors or openers (if applicable)
  • Seals, gaskets, and sweeps for weatherproofing

Technicians ensure everything operates smoothly before proceeding to final testing.

7. Testing and Final Adjustments

After installation, the door is tested for full functionality. This includes making sure it opens and closes easily, locks securely, aligns with the frame, and meets safety requirements.

Tests include:

  • Smooth opening/closing without drag or gaps
  • Lock and latch function
  • ADA and fire code compliance
  • Proper sensor alignment (for automatic doors)
  • Weather stripping and seal checks

Technicians make any final adjustments and confirm performance before completing the job.

8. Cleanup and Walkthrough

Once everything is in place, the installation crew will clean the area, dispose of old materials, and provide a full walkthrough with you.

During the walkthrough:

  • You’ll receive an overview of how to use and maintain the new door
  • Warranty and care information will be shared
  • You can ask questions or request final tweaks if needed

A professional team will leave your entrance area clean, safe, and ready for business.

Final Thoughts

Whether you’re upgrading for security, compliance, or aesthetics, a professional commercial door installation offers long-term benefits. With the right contractor, the process is efficient, safe, and tailored to your needs, minimizing downtime while enhancing your facility’s performance and appearance.

Knowing what to expect helps you plan accordingly and ensures a smoother transition with fewer surprises. Trusting experienced professionals ensures your new doors not only look great but operate reliably for years to come.